Print Friendly

     Idaho Statutes

Idaho Statutes are updated to the website July 1 following the legislative session.

pecnv.out

TITLE 42
IRRIGATION AND DRAINAGE — WATER RIGHTS AND RECLAMATION
CHAPTER 17
DEPARTMENT OF WATER RESOURCES — WATER RESOURCE BOARD
42-1716.  Notice of completion — Filing of supplementary drawings or descriptive matter. Immediately upon completion of a new dam, reservoir or mine tailings impoundment structure or enlargement or repair of a dam, reservoir or mine tailings impoundment structure the owner shall give notice of completion to the director, and as soon thereafter as possible file with the director supplementary drawings or descriptive matter showing or describing the dam, reservoir or mine tailings impoundment structure as actually constructed, including the following:
(a)  A record of all grout holes and grouting.
(b)  A record of permanent location points and bench marks.
(c)  A record of tests of concrete or other material used in the construction of the dam, reservoir or mine tailings impoundment structure.
(d)  Any other items which may be of permanent value and have a bearing on the safety and performances of the dam, reservoir or mine tailings impoundment structure.
In connection with the enlargement or repair of a dam, reservoir or mine tailings impoundment structure, the supplementary drawings and descriptive matter need apply only to the new work.

History:
[42-1716, added 1969, ch. 280, sec. 7, p. 833; am. 1974, ch. 20, sec. 17, p. 533; am. 1978, ch. 309, sec. 7, p. 790.]


How current is this law?